Table 3 For all cases, total system costs decrease when co-optimizing the power and water sectors.
From: Simulated co-optimization of renewable energy and desalination systems in Neom, Saudi Arabia
System | Investment cost [M$] | Operating cost [M$] | Total cost [M$] | % Change of Total Cost |
---|---|---|---|---|
Independent / Co-Optimization | Â | |||
Base | 2066 / 1993 | 2646 / 2615 | 4712 / 4608 | −2.2 |
KSA Grid | 1507 / 1521 | 2706 / 2683 | 4213 / 4204 | −0.2 |
Wind Only | 5449 / 4907 | 2496 / 2490 | 7945 / 7397 | −6.9 |
PV Only | 14,127 / 13,387 | 3441 / 3416 | 17,568 / 16,803 | −4.4 |