Fig. 7: Simulation plots for effective rate parameter from Eq. (13) and average run-time to contrast SEM (dashed) versus AEM (solid). | npj Quantum Information

Fig. 7: Simulation plots for effective rate parameter from Eq. (13) and average run-time to contrast SEM (dashed) versus AEM (solid).

From: A quantum solution for efficient use of symmetries in the simulation of many-body systems

Fig. 7

For each plot, either \({T}_{1}\) (blue) or \({T}_{2}\)(red) are fixed at \(1{0}^{9} \sim \infty\) and the other is varied. In all cases, the number of trials is 4000. \({T}_{1}\), \({T}_{2}\) and average run-time are measured in units of the SQGT. Error bars for the effective rate parameter are calculated according to Eq. (14). a Effective rate parameter plot for \({\mathrm{log}}| G| =4\). b Effective rate parameter plot for \({\mathrm{log}}| G| =5\). c Average run-time plot for \({\mathrm{log}}| G| =4\). d Average run-time plot for \({\mathrm{log}}| G| =5\).

Back to article page