Fig. 11

Water production during March 22–26 (left), and during August 5–9 (right) in Almeria, Spain from a 2.5MWe PT-CSP plant coupled with a 2000 m3/day MED plant. (a) Without thermal energy storage (TES); (b) with the addition of a 4-hr TES.

Water production during March 22–26 (left), and during August 5–9 (right) in Almeria, Spain from a 2.5MWe PT-CSP plant coupled with a 2000 m3/day MED plant. (a) Without thermal energy storage (TES); (b) with the addition of a 4-hr TES.