Fig. 7

Met City 2 during Leg 4. (a) Tower and nearby installations at Met City 2 on 22 July. (b,c) ARM ICERAD/GNDRAD systems during period of expansion of melt ponds. (d) Wide-angle photograph of the surface beneath the ASFS-50 boom at First Year Ice (FYI) on 26 July.