Fig. 7 | Scientific Data

Fig. 7

From: Measurements of dune erosion processes during the RealDune/REFLEX experiments

Fig. 7

Deployment times during the main November-December deployment of the pressure sensors (RBRs open orange, OSSIs filled orange), velocimeters (ADVs green, JFEs red), OBSs (pink), and lidars (brown). Gaps in each timeline represent periods in which the instrument was not in the field, most likely due to a service interval in which batteries of the instrument were replaced and data were retrieved. * The lidars did not always produce data when they were in the field, most likely because the intensity of the reflected beam was insufficient, or due to power supply issues. This means there are not always processed data files for the times displayed in the timeline above. e.g., lidar 2 (L2) was unable to produce data during the December 2 storm.

Back to article page