Table 1 Contingency table for the estimation of fold-change-specificity of a GO term.
The number of UGs in the fold change interval | The number of UGs outside the fold change interval | Total number of UGs | The portion of UGs in the fold change interval | |
---|---|---|---|---|
The UGs belonging to the GO term | 96 | 12 | 108 | 88.9%*** |
The rest UGs | 167 | 514 | 681 | 24.6% |
Total number of UGs | 263 | 526 | 789 | 33.3% |