Figure 3

Violation risks of COD discharge in Scenarios 1 to 3. The parameters of C1 and C2 indicate probability of the incident (i.e., failure to meet total allowable target on wastewater discharge) would be 0.05. The parameters of L1 and L2 indicate the lower and upper bounds of discharge caps in COD.