Figure 2

(a) Rainfall per hour and discharge measured at CHS gauge at downstream end of Nogalte in event on 28 September, 2012; (b) Relationship between calculated peak discharge at surveyed cross-sections and catchment area and gauged peak flow at downstream end of catchment (Puerto Lumbreras).