Table 2 Rainfall criteria in different periods of landslides in Yunyang County.
Period | Reservoir water level scheduling | Rainfall criteria | |
---|---|---|---|
Rainfall duration | Rainfall amount | ||
May | Decline | Continuous 4 days | Cumulative rainfall exceeding 30 mm |
Jun–Aug | Low water level | Continuous 5 days | |
Sep | Rise | Continuous 4 days |