Figure 4

Battery vs reservoir preliminary design size and corresponding iso-lines of the cost for energy storage facilities. Unit costs considered are: 200 € per kWh/(m3d−1) with payback of 5 years for the battery and 50 € per m3/(m3d−1) with payback of 10 years for the reservoir. Reservoir search radius of 1 km.