Table 4 The mass variations of solidified desert sand samples of EICP after blowing at different wind speeds during the wind tunnel tests.

From: Enzyme-catalysed mineralisation experiment study to solidify desert sands

Spraying times

Initial mass (g)

Wind speed: 14.0 m/s

Wind speed: 22.7 m/s

Wind speed: 29.1 m/s

Mass blown (g)

Mass changes (g)

Mass blown (g)

Mass changes (g)

Mass blown (g)

Mass changes (g)

0

2,730

1,736

− 994

1,019

− 1,711

426

− 2,184

2

2,736

2,716

− 20

2,687

− 29

2,626

− 61

4

2,744

2,743

− 1

2,735

− 8

2,691

− 44

6

2,755

2,753

− 1

2,751

− 2

2,749

− 3