Figure 1

Predicted probability of a HIT-6 value of greater than or equal to 60 based on the CD4 EM values. The blue curve shows the predicted probability (point estimator) of a HIT-6 value of greater than or equal to 60 for the range of observed CD4 EM values. The shaded (light red) area depicts the 95% confidence interval estimate of the probability.