Table 3 Comparison of results obtained in the two methods.
Nu | |||
---|---|---|---|
Present work | Devis22 | Error (%) | |
\(Ra={10}^{4}\) | 2.251 | 2.242 | 0.401 |
\(Ra={10}^{5}\) | 4.532 | 4.5028 | 0.648 |
\(Ra={10}^{6}\) | 9.232 | 9.035 | 2.1 |
Nu | |||
---|---|---|---|
Present work | Devis22 | Error (%) | |
\(Ra={10}^{4}\) | 2.251 | 2.242 | 0.401 |
\(Ra={10}^{5}\) | 4.532 | 4.5028 | 0.648 |
\(Ra={10}^{6}\) | 9.232 | 9.035 | 2.1 |