Table 8 Computational conditions of the different schemes.
Scheme No | Name | Water–sediment conditions | Water level in front of the dam |
---|---|---|---|
1 | Basic scheme | Water–sediment conditions in 1961–1970 | The reservoir operated with the water level in front of the dam being 135–139 m from June 2003 to June 2006; the reservoir operated with the water level in front of the dam being 144–156 m from September 2006 to September 2008; the reservoir operated with the water level in front of the dam being 175–145–155 m from October 2008 to June 2602 |
2 | Water–sediment conditions in 1991–2000 | ||
3 | Smaller water and larger sediment | Water–sediment conditions in 2003 | The same as above |
4 | Larger water and larger sediment | Water–sediment conditions in 2005 | The same as above |
5 | Medium water and larger sediment | Water–sediment conditions in 2007 | The same as above |
6 | Smaller water and medium sediment | Water–sediment conditions in 2011 | The same as above |
7 | Medium water and medium sediment | Water–sediment conditions in 2013 | The same as above |
8 | Larger water and smaller sediment | Water–sediment conditions in 2014 | The same as above |
9 | Smaller water and smaller sediment | Water–sediment conditions in 2015 | The same as above |
10 | Medium water and smaller sediment | Water–sediment conditions in 2017 | The same as above |
11 | Larger water and medium sediment | Water–sediment conditions in 2018 | The same as above |