Table 4 Simulation results for the Arrat’s reach.
From: Network flow and flood routing model for water resources optimization
RSM | Muskingum | |
|---|---|---|
RMS (\(m^3 s^{-1}\)) | 0.44 | 0.43 |
Error (\(\%\)) | 7.1 | 6.6 |
From: Network flow and flood routing model for water resources optimization
RSM | Muskingum | |
|---|---|---|
RMS (\(m^3 s^{-1}\)) | 0.44 | 0.43 |
Error (\(\%\)) | 7.1 | 6.6 |