Table 2 Operating conditions for EBR.

From: Removal of organic matter and nutrients from hospital wastewater by electro bioreactor coupled with tubesettler

S.no

Characteristics

Period (days)

0–20

20–30

30–40

50–60

1

Cycle (h)

24

20

18

12

2

Loading rate (kg COD/m3/day)

0.28

1.25

2.25

3.45

3

COD removal (%)

82

65

74

80

4

Current timing (10 milliamperes)

20

30

40

50

5

SVI (ml/g MLSS)

114–124

104

106

70–80

6

MLSS (g/L)

2.1–3.1

3.2–4.2

4.2–6.2

6.2–7.2