Table 6 dDNP maintenance routine, conducted once a week (automatically and scheduled).

From: Performance and reproducibility of 13C and 15N hyperpolarization using a cryogen-free DNP polarizer

No

Operation

Comments

Norm values

 

Stop the dry pump

 

0 Hz

 

Reduce the He flow

  
 

The VTI T increases automatically

It takes at least 6 h

150 K (at least)

 

The system stays warm for at least 38 h

It is possible to use the entire weekend

 
 

Automatic cleaning of the VTI by using the vacuum pump when the T is higher than 150 K

  
 

Decrease the T again

 ~ 3 h

 
  1. The total duration is 48 h from the start of the routine.