Figure 9
From: Flood impacts on urban road connectivity in southern China

Un-flooded road network under different rainfall scenarios: (a) Rainfall Return Period = 2a; (b) Rainfall Return Period = 5a; (c) Rainfall Return Period = 10a; (d) Rainfall Return Period = 20a; (e) Rainfall Return Period = 50a; (f) Rainfall Return Period = 100a. This map was generated with ArcMap Version 10.0. (https://www.esri.com/en-us/arcgis/products/arcgis-desktop/overview).