Figure 8
From: Application of TEM and HDRM in hydrogeophysical surveys in Meisibulake coal mine

Drill column of geological prospecting boreholes. (a) 3–1 borehole, (b) 3–2 borehole.
From: Application of TEM and HDRM in hydrogeophysical surveys in Meisibulake coal mine
Drill column of geological prospecting boreholes. (a) 3–1 borehole, (b) 3–2 borehole.