Figure 9

(a) SEM–EDS point analysis (1, 2, and 3) of the welded joint with E2 (b) EDS line mapping of the welded joint with E1 across the weldments to detect the presence of precipitates.
(a) SEM–EDS point analysis (1, 2, and 3) of the welded joint with E2 (b) EDS line mapping of the welded joint with E1 across the weldments to detect the presence of precipitates.