Table 3 Summary of AB delineation.
Order | No. of streams | MSW (m) | Dd1977 (km/km2) | Dd2021 (km/km2) | DdR = Dd1977/Dd2021 | WAB = MSW × DdR (m) | WRAB = WAB/2 (m) | WLAB = WAB/2 (m) |
|---|---|---|---|---|---|---|---|---|
1st order | 128 | 13.78 | 2.48 | 0.74 | 3.35 | 46.16 | 23.08 | 23.08 |
2nd order | 37 | 24.17 | 80.97 | 40.49 | 40.49 | |||
3rd order | 9 | 40.17 | 134.57 | 67.29 | 67.29 | |||
4th order | 1 | 82.93 | 277.83 | 138.91 | 138.91 |