Table 6 Calculated YAI values of rock pillar under different RPT/TD.

From: Stability evaluation of rock pillar between twin tunnels using the YAI

RPT/TD

YAI

Left–right tunnels

Up-down tunnels

I

II

III

IV

1/4 (RPT = 1.5 m)

0.539

0.295

0.862

0.656

1/3 (RPT = 2 m)

0.590

0.395

0.873

0.699

1/2 (RPT = 3 m)

0.658

0.527

0.885

0.753

2/3 (RPT = 4 m)

0.697

0.606

0.895

0.799

1 (RPT = 6 m)

0.738

0.689

0.891

0.862