Table 4 Climbing formwork construction safety risk evaluation index system.

From: Ordered weighted evaluation method of lifting operation safety risks considering coupling effect

Phase

Index

Indicator description

Phase

Index

Indicator description

Lifting preparation

X11

The unqualified comprehensive acceptance system leads to the equipment and components leaving the factory with diseases

Component lifting

X31

Equipment safety device failure leads to overload lifting

X12

Unreasonable equipment layout causes potential safety hazard

X32

Defects in the equipment lead to operational errors

X13

Unreasonable storage of equipment and components causes quality problems

X33

Operation error caused by illegal command

Component binding

X21

Improper binding of components caused by workers ' illegal operation

X34

Workers ' risky work caused by low safety awareness

X22

Improper safety supervision leads to quality defects in slings

X35

The lifting is not carried out according to the scheme, resulting in component collision

X23

Low safety awareness causes workers to operate illegally

X36

Edge, high and climbing operation protection is not in place

X24

Failure to implement the scheme leads to improper binding of components

 

X37

Improper binding causes the component to fall off

 

X25

Technical disclosure leads to improper binding of components

Component unloading

X41

Unreasonable unloading of components caused by improper construction scheme and illegal operation of workers