Table 9 Cost analysis of projected soil to be stabilized using conventional soil stabilizers and proposed soil stabilizers.
Type of sample | Quantity of stabilizer (kg) | Total cost (RM) | |||
---|---|---|---|---|---|
Cm | S | Cs | Lime | ||
C6Cm | 600 | - | - | - | 852.12 |
C9Cm | 900 | - | - | - | 1017.18 |
C12Cm | 1200 | - | - | - | 1182.24 |
C15Cm | 1500 | - | - | - | 1347.30 |
CS6 | - | 600 | - | - | 915.15 |
CS6Cs3 | - | 600 | 300 | - | 914.83 |
CS6Cs6 | - | 600 | 600 | - | 916.09 |
CS6Cs9 | - | 600 | 900 | - | 916.25 |
CS6L3 | - | 600 | - | 300 | 1074.92 |
CS6L6 | - | 600 | - | 600 | 1234.09 |
CS6L9 | - | 600 | - | 900 | 1393.25 |