Table 3 The average values of the objective functions for the three ensembles before and after EnKF integration.
Ensemble | Average objective function | |
---|---|---|
Before EnKF | After EnKF | |
A | 568.4 | 153.9 |
B | 596.5 | 135.4 |
C | 598.4 | 136.6 |
Ensemble | Average objective function | |
---|---|---|
Before EnKF | After EnKF | |
A | 568.4 | 153.9 |
B | 596.5 | 135.4 |
C | 598.4 | 136.6 |