Table 2 Construction period comparison.
Design scenarios | Construction period (month) |
---|---|
Unoptimized design | 18 |
Energy-efficient design | 16 |
Carbon emission reduction design | 17 |
The design proposed here | 15 |
Design scenarios | Construction period (month) |
---|---|
Unoptimized design | 18 |
Energy-efficient design | 16 |
Carbon emission reduction design | 17 |
The design proposed here | 15 |