Table 9 Tailing dam operating items.

From: Thiosulfate leaching in carbonaceous gold-bearing ores in Ethiopia

Item no

Spare part replacements

Costs per annum (Birr)

1

Electrical parts (breakers, contactors, cables etc.)

100,000.00

2

Pump parts

1,200,000.00

3

Return pipe and fitting replacements

1,100,000.00

4

Hose and Valve parts

150,000.00

5

Bearing replacements

60,000.00

 

Total

2,610,000.00

Item no

Running items and utilities

Costs per annum (Birr)

1

Consumables for cyanide titration & pH determination

54,750.00

2

Power consumption for:

 

2.1

Two return pumps at 11KW capacity working for 23 h per day

110,814.00

3

Man power (Eight operators with 4000 Birr monthly salary each)

384,000.00

 

Total

549,564.00