Table 11 Validation assessment of the RBN for study case no. 26.
Unit | Actual output | Simulated output | Error (PU) |
---|---|---|---|
PV (kW) | 1979 | 1977 | 0.001 |
WT (kW) | 2340 | 2489 | 0.064 |
Flywheel (#) | 5 | 5 | 0.011 |
Converter (kW) | 818 | 736 | 0.101 |
Unit | Actual output | Simulated output | Error (PU) |
---|---|---|---|
PV (kW) | 1979 | 1977 | 0.001 |
WT (kW) | 2340 | 2489 | 0.064 |
Flywheel (#) | 5 | 5 | 0.011 |
Converter (kW) | 818 | 736 | 0.101 |