Table 1 The results of EPLs optimization in the 33-bus network (scenario#1).

From: An improved meta-heuristic method for optimal optimization of electric parking lots in distribution network

Item/value

Base network

IFHO

FHO

PSO

GWO

MRFO

AEFA

EPLs size/@location (bus)

–

275/@8

354/@14

349/@29

133/@8

342/@14

191/@31

101/@32

258/@7

275/@8

196/@29

137/@7

444/@29

300/@32

332/@14

158/@21

347/@24

266/@32

386/@21

244/@24

292/@31

Cost of losses ($)

53,144

37,396

37,863

37,534

37,580

37,679

37,612

Voltage deviation (p.u)

0.0176

0.0148

0.0149

0.0148

0.0148

0.0149

0.0148

Cost of ENS ($)

1,188,585

333,347

335,311

333,937

334,131

334,525

334,250

Cost of grid ($)

1,694,846

999,574

1,005,679

1,001,404

1,002,007

1,003,240

1,002,383

Cost of EPLS ($)

–

1,181,920

1,209,473

1,205,771

1,207,532

1,210,205

1,216,954

OF

1

0.7356

0.7399

0.7369

0.7373

0.7383

0.7377