Table 5 Numerical results of EPLS optimization in 33-bus distribution network (scenario#3).

From: An improved meta-heuristic method for optimal optimization of electric parking lots in distribution network

Item/value

Base Network

IFHO

FHO

PSO

GWO

MRFO

AEFA

EPLs size/@Location (bus)

–

125/@14

172/@21

427/@31

332/@32

156/@7

344/@14

245/@24

228/@32

423/@7

236/@14

220/@21

320/@14

334/@29

224/@31

355/@32

218/@14

237/@21

302/@29

271/@31

267/@32

36/@8

194/@14

385/@29

217/@32

Cost of losses ($)

55,482

43,796

44,689

44,065

44,195

44,510

44,599

Voltage deviation (p.u)

0.0181

0.0159

0.0161

0.0160

0.0160

0.0161

0.0161

Cost of ENS ($)

1,240,127

361,873

365,320

362,907

363,424

364,630

364,976

Cost of grid ($)

1,786,303

1,087,923

1,098,704

1,092,769

1,027,025

1,096,548

1,097,630

Cost of EPLS ($)

–

1,251,031

1,290,189

1,265,873

1,273,504

1,281,793

1,288,455

OF

1

0.7951

0.8032

0.7975

0.7987

0.8015

0.8023