Table 1 Comparison of system excavation results and experts’ recommendations.
Number of winter dominant wind direction corridors | Number of summer dominant wind direction corridors | Corridor location consistency (relative to system results) | Corridor length consistency (relative to system results) | |
---|---|---|---|---|
System | 2 | 4 | 100% | 100% |
Expert 1 | 2 | 4 | 95.16% | 94.82% |
Expert 2 | 2 | 4 | 94.83% | 95.37% |
Expert 3 | 2 | 4 | 95.27% | 96.10% |