Table 3 Performance assessment with employed techniques for Case I.

From: A Golden Jackal based optimal operation and optimization of a virtual power plant involving renewable resources

Output ($)

Proposed GJO

BWA

SSA

C & CG36

DRAACF37

minimum cost

5712.71

5748.42

5835.6

6400

6066.46

Maximum cost

7185.23

7224.36

7298.3

-

-

Mean cost

6448.97

6486.39

6566.95

-

-

Computational run time (sec.)

181.97

235.21

261.46

-

342.87