Table 11 Engineering parameters of T1 and T2 projects.
Project | T1 | T2 |
|---|---|---|
Qi(m³/s) | 40.0 | 40.0 |
D(m) | 48.00 | 100.00 |
Bi(m) | 9.60 | 20.00 |
Hi(m) | 2.40 | 7.00 |
Rf(m) | 0.38 | 0.50 |
Bd(m) | 9.60 | 20.00 |
h(m) | 3.90 | 9.00 |
Ret (×106) | 20.5 | 8.0 |
Project | T1 | T2 |
|---|---|---|
Qi(m³/s) | 40.0 | 40.0 |
D(m) | 48.00 | 100.00 |
Bi(m) | 9.60 | 20.00 |
Hi(m) | 2.40 | 7.00 |
Rf(m) | 0.38 | 0.50 |
Bd(m) | 9.60 | 20.00 |
h(m) | 3.90 | 9.00 |
Ret (×106) | 20.5 | 8.0 |