Table 20 Route performance before and after optimization.
Performance indicator | Before | After | Improvement (%) |
|---|---|---|---|
Total distance (km) | 5200 | 3800 | 26.7 |
Delivery time (hr) | 55 | 42 | 23.6 |
Operational cost (EGP) | 1,040,000 | 760,000 | 26.7 |
CO₂ emissions (kg) | 624 | 456 | 26.7 |
Number of route crossings | 14 | 3 | 78.6 |