Table 3 Start points and end points of the 11 cables.

From: The optimal grouting area and cable distribution design for guaranteeing roadway stability while considering fluid mechanical effects via the CMOEAD algorithm

Series number

Start point

End point

1

(2.77, 0)

(9.27,0)

2

(2.63, 1.02)

(8.81, 3.03)

3

(2.24,1.94)

(7.50,5.76)

4

(1.63,2.67)

(5.45,7.93)

5

(0.85,3.14)

(2.87,9.32)

6

(0.01,3.29)

(0.01,9.80)

7

(−0.85,3.13)

(−2.85,9.32)

8

(−1.63,2.67)

(−5.44,7.93)

9

(−2.24,1.93)

(−7.49,5.77)

10

(−2.63,1.02)

(−8.81,3.04)

11

(−2.76,0.01)

(−9.26,0.01)