Table 3 Comparative cost analysis for different cases with existing literature.

From: Advanced microgrid optimization using price-elastic demand response and greedy rat swarm optimization for economic and environmental efficiency

Optimization algorithm

Ref.

(A/TOU)

(P/TOU)

Without RES

(A/FP)

Case 1

Case 2

Case 3

Case 4

PSO

77

889

-

1709

-

DE

77

886

-

1704

-

DEGL

77

883

-

1703

-

GWO

78

1086

-

1803

-

MGWO

78

1049

-

1746.5

-

MGWOSCACSA

78

882.5

-

1701.5

-

CSAJAYA

49

880.95

989.77

1699.2

939.16

CSAJAYA with 5% DSM

79

859.5

955.31

1680.5

932.46

CSAJAYA with 10% DSM

79

842.1

934.71

1661.5

929.45

CSAJAYA with 15% DSM

79

823.15

914.11

1640.5

926.8

CSAJAYA with 20% DSM

79

807.2

897.36

1621.2

925.66

CSAJAYA with DR

49

871.9796

976.0604

1687.2141

Not Applicable

GRSO (Base load demand)

Proposed work

882

989

1701

939

GRSO (limited grid operation)

948

1055

1800

977

GRSO with CPP based LP

746

856

1553

802

GRSO with TOU based LP

775

881

1568

827

GRSO with RTP based LP

863

972

1680

921

GRSO with logarithmic LP

765

817

1551

836

GRSO with exponential LP

843

943

1663

905

GRSO with hyperbolic LP

882

989

1705

938