Table 6 Estimated cost of a city-wide RB system (r1–r5), value of harvested rainwater, cost and area of a city-wide RG system (r6–r11).

From: Integrating social data and engineering solutions for developing resilient water infrastructure against coastal climate change

Row

Parameter

Value

Source/formula

r1

Harvested rainwater during the 4-year representative wet period (m3)

1,014,490

Modeling output

r2

Harvested rainwater over the 50-year expected life of RB units (m3)

12,681,124

r1 × 50/4

r3

Estimated cost of one cubic meter of tap water in San Diego ($)

5

Statistica62

r4

Estimated Value of harvested rainwater over the 50-year expected life of RB units ($)

63,405,618

r3 × r2

r5

Estimated cost of RB implementation in the city ($)

3,315,358

Equation (2)

r1

Total area of urbanized region (m2)

5,784,944

GIS mapping

r6

Total area of urban parcels (m2)

4,120,476

GIS mapping

r7

Ratio of RG surface area to catchment area (or urban parcels)

0.05

Liu and Fassman-Beck56

r8

Total area of the city-wide RG system (m2)

137,273

r2, r3, and adoption rates

r9

Estimated cost of one square foot (or 0.093 m2) of RG ($)

10

CostHelper57

r10

Ratio of RG surface area to urbanized area (%)

2.4

r4/r1

r11

Estimated cost of the city-wide RG system ($)

14,776,000

r5 × r4/0.093