Table 3 Converter parameters.
From: Advanced AI approaches for the modeling and optimization of microgrid energy systems
Type of parameter | Value |
---|---|
Nominal power | 150Â kW |
The efficiency | r = 90% |
Cost of installation per kw | 127 $/kW |
M & O cost (per kW | 1 $/Kw |