Table 3 Results of the path analysis.
Estimate | |||||||||
|---|---|---|---|---|---|---|---|---|---|
analysis | k | n | M1 → M2 | P1 → P2 | M1 ~ P1 | M2 ~ P2 | M1 → P2 | P1 → M2 | |
Overall | 11 | 4386 | 0.805** | 0.491** | 0.340** | 0.128** | 0.143** | −0.014 | |
performance measure | TP | 9 | 4021 | 0.805** | 0.487** | 0.330** | 0.248** | 0.129** | −0.016 |
OCB | 5 | 1337 | 0.858** | 0.631** | 0.340** | 0.388** | 0.085** | −0.052** | |
motivation measure | WE | 8 | 3599 | 0.824** | 0.487** | 0.320** | 0.118** | 0.134** | −0.014 |
other | 4 | 1145 | 0.759** | 0.559** | 0.410** | 0.411** | 0.101** | −0.071** | |
time lag | 1–6 months | 7 | 1728 | 0.836** | 0.571** | 0.400** | 0.136** | 0.121** | −0.014 |
7–12 months | 4 | 2658 | 0.799** | 0.443** | 0.310** | 0.232** | 0.153** | −0.028* | |