Table 5 Hypothesis test results.
Path | Path coefficient | t value | p value | f2 value | 95% confidence interval | Test result |
---|---|---|---|---|---|---|
H1: PE → BI | 0.310 | 5.597 | 0.000 | 0.172 | [0.203, 0.419] | Supported |
H2: EE → BI | 0.186 | 2.913 | 0.004 | 0.042 | [0.061, 0.310] | Supported |
H3: SI → BI | 0.149 | 2.955 | 0.003 | 0.040 | [0.044, 0.241] | Supported |
H4: ATT → BI | 0.102 | 1.435 | 0.151 | 0.019 | [−0.047, 0.234] | Unsupported |
H5: BI → UB | 0.438 | 6.923 | 0.000 | 0.237 | [0.306, 0.554] | Supported |