Fig. 4: Projected area-averaged regional changes in summer moisture budget terms (mm/day).
From: Understanding drivers and uncertainty in projected African precipitation

The changes in moisture budget terms in the long term (2050–2099, under the SSP2-4.5 and SSP5–8.5 scenarios) averaged over (a–i) the nine regions, relative to 1965–2014. The bars represent the CMIP6 EnsMean, while the vertical line denotes the plus/minus one-time STD based on the spread across all CMIP6 models.