Fig. 2: Probability distributions of AMP4day over NCP and relative contributions of different components to its future change. | Communications Earth & Environment

Fig. 2: Probability distributions of AMP4day over NCP and relative contributions of different components to its future change.

From: Dynamics-constrained rainfall projection reveals substantial increase in population exposure to unprecedented floods in the North China Plain

Fig. 2

a Probability distribution of the normalized AMP4day (i.e., minus the mean and divided by the standard deviation) from the CESM-LENS output under different factual and counterfactual experiments. b Relative contribution of thermodynamic, dynamic, and their interaction to future AMP4day changes. The inset plot in a is zoomed section outlined by the dashed black box. The shade represents the uncertainty band (i.e., 25th–75th percentile) attributed to GEV fitting and sampling uncertainty (see the “Methods” section).

Back to article page