Fig. 1: Overview of the model setup for the Yellow River Delta. | Communications Earth & Environment

Fig. 1: Overview of the model setup for the Yellow River Delta.

From: Natural process-based coastal wetland restoration by relocating river flow paths in a river-dominated delta

Fig. 1

a Bathymetric profile and model grids with observation and tidal stations; b river flow path relocation scenarios, including current and proposed paths; and c upstream boundary conditions. QN the current existing pathway, QS the Qingshuigou Southeast pathway, DK the Diaokou River pathway. Solid lines denote the current river flow path, while dashed lines indicate the proposed relocations in this study.

Back to article page