Table 1 Major components and existing management strategies for brines from different industries
From: Brine management with zero and minimal liquid discharge
Industry | Components of concern | Current brine management strategy | Refs. |
---|---|---|---|
Desalination | Precursors for mineral scaling | Ocean discharge, deep-well injection, evaporation pond | |
Oil and gas | Organic contaminants, naturally occurring radioactive materials | Deep-well injection and evaporation pond | |
Mining | Heavy metals, precursors for mineral scaling, sulfate | Evaporation, underground injection, perpetual storage | |
Semiconductor | Fluoride, tetramethylammonium hydroxide, PFAS | ZLD (with MVC and BCr or evaporation pond) | |
Power | TSS, sulfate, chloride, heavy metals (such as Hg, As and Se) | ZLD (with MVC and BCr) |