Figure 5
From: Remediation of chromium-slag leakage with electricity cogeneration via a urea-Cr(VI) cell

Amount of Cr(VI) in the leakage at different pH values in the dynamic leaching procedure.
(5 g samples, flow rate of 4.5 mL/h, equal to the level of heavy rain.).