Table 1 The five highlighted periods of increased conductivity in the Wakulla conduits.
Period | Start | End | Length (days) |
---|---|---|---|
1 | 2007-05-15 | 2008-02-28 | 289 |
2 | 2008-04-15 | 2008-08-31 | 138 |
3 | 2011-05-13 | 2012-03-24 | 316 |
4 | 2012-05-02 | 2012-07-06 | 65 |
5 | 2012-10-31 | 2013-03-06 | 136 |