Table 4 Cases studies.
Load/condition/objective | Case-1 | Case-2 | Case-3 |
---|---|---|---|
Stable G (1000 W/m2) | ✤ |  |  |
Varying G |  | ✤ | ✤ |
Constant wind Velocity (11 m/sec) | ✤ |  |  |
Variable velocity |  | ✤ | ✤ |
Load1: nonlinear balanced bridged rectifier: 60Ω &30mH | ✤ | ✤ | ✤ |
Load2: nonlinear balanced bridged rectifier: 20Ω &1mH | ✤ | ✤ |  |
Load 3: RL Unbalanced Load R1, L1 = 10 Ω, 1.5 mH; R2, L2 = 40 Ω, 3.5 mH &; R3, L3 = 70 Ω, 2.5 mH |  |  | ✤ |
Load 4: EV charging station |  | ✤ | ✤ |
Load 5: Asynchronous motor load R = 500 Ω, L = 30 mH |  | ✤ | ✤ |
Load 6: Electric arc furnace |  |  | ✤ |
THD | ✤ | ✤ | ✤ |
PF | ✤ | ✤ | ✤ |
DCBCV stability | ✤ | ✤ | ✤ |
Power flow regulation | ✤ | ✤ | ✤ |