Table 11 Results comparison of the deterministic- and stochastic- stochastic-MORWTA for unbalanced 25-bus network.
Method/item | Deterministic-MORWTA | Stochastic-MORWTA | Change (%) |
---|---|---|---|
Opened switches | 15, 17, 22 | 13, 17, 22 | – |
WT location (@bus)/size (kW)/p.f | @7/611/0.89 | @7/673/0.88 | – |
Power loss (kW) | 75.42 | 89.26 | 18.35 \(\uparrow\) |
Voltage sag (p.u) | 0.5546 | 0.6049 | 9.07 \(\uparrow\) |
THD (%) | 0.3450 | 0.3810 | 10.43 \(\uparrow\) |
Voltage Unbalance (%) | 0.2791 | 0.2801 | 12.46 \(\uparrow\) |
Energy Not-supplied (MWh) | 2.94 | 3.29 | 11.90 \(\uparrow\) |
SAIFI (failure/customer/yr) | 0.97 | 1.06 | 9.28 \(\uparrow\) |
SAIDI (hour/customer/yr) | 0.74 | 0.83 | 12.16 \(\uparrow\) |
MAIFI (mom/customer/yr) | 2.02 | 2.31 | 14.36 \(\uparrow\) |
Objective Function | 0.7089 | 0.7835 | 10.52 \(\uparrow\) |