Table 12 Numerical results of scenario#2 optimization for unbalanced 37-bus distribution network.
Method/Item | Base Net | IDO | DO | GWO | PSO | AOA |
---|---|---|---|---|---|---|
Opened switches | 735–741, 701–722, 727–732 | 704–720, 708–732, 710–734 | 704–713, 708–709, 710–734 | 704–720, 708–732, 737–738 | 707–720, 708–732, 710–734 | 704–720, 709–730, 734–737 |
WT location (@bus)/Size (kW)/p.f | – | @706/579/0.83 | @707/566/0.84 | @737/559/0.84 | @704/583/0.82 | @720/573/0.82 |
Power loss (kW) | 83.17 | 38.78 | 39.71 | 39.54 | 39.15 | 39.58 |
Voltage sag (p.u) | 0.6755 | 0.4583 | 0.4596 | 0.4591 | 0.4587 | 0.4594 |
THD (%) | 0.2183 | 0.1472 | 0.1478 | 0.1475 | 0.1473 | 0.1478 |
Voltage Unbalance (%) | 0.139 | 0.101 | 0.101 | 0.101 | 0.101 | 0.101 |
Energy Not-supplied (MWh) | 2.257 | 1.689 | 1.697 | 1.693 | 1.691 | 1.695 |
SAIFI (failure/customer/yr) | 0.76 | 0.71 | 0.75 | 0.74 | 0.72 | 0.75 |
SAIDI (hour/customer/yr) | 0.64 | 0.55 | 0.62 | 0.58 | 0.57 | 0.60 |
MAIFI (mom/customer/yr) | 1.48 | 1.36 | 1.42 | 1.41 | 1.39 | 1.42 |
Objective function | 1 | 0.7505 | 0.7787 | 0.7675 | 0.7599 | 0.7745 |