Table 7 Results comparison of Scenarios# 1, and 2 for modified 33-bus distribution network.
Method/Item | Deterministic-MORWTA | Stochastic-MORWTA | Change (%) |
---|---|---|---|
Opened switches | 10, 20, 28, 30, 35 | 7, 11, 28, 34, 36 | – |
PV location (@bus)/Size (kW)/p.f | @7/894/0.86 | @7/926/0.88 | – |
Power loss (kW) | 112.79 | 137.94 | 22.30 \(\uparrow\) |
Voltage sag (p.u) | 0.42 | 0.49 | 16.67 \(\uparrow\) |
THD (%) | 0.1725 | 0.1964 | 13.86 \(\uparrow\) |
Voltage unbalance (%) | 2.07 | 2.39 | 15.46 \(\uparrow\) |
Energy not-supplied (MWh) | 5.13 | 5.68 | 10.72 \(\uparrow\) |
SAIFI (failure/customer/yr) | 1.18 | 1.30 | 10.17 \(\uparrow\) |
SAIDI (hour/customer/yr) | 1.03 | 1.15 | 11.65 \(\uparrow\) |
MAIFI (mom/customer/yr) | 2.38 | 2.75 | 15.55 \(\uparrow\) |
Objective function | 0.6715 | 0.7213 | 7.42 \(\uparrow\) |